Quick thinking keeps remodel on track and on budget

When Northwest Church in Fresno, California remodeled their sanctuary they had Johnson Air engineer a system that would reduce energy use, and minimize noise in the sanctuary. Johnson Air served as the design/build contractor in the 8,300 sqft remodel, dealing with structural conditions that included limited space for ductwork and equipment. By working closely with the project’s architect, general contractor, and other trades; Johnson Air was able to accommodate space restrictions without change orders or delaying other trades.