Designed from the start for energy efficiency

When one of Fresno’s top Orthodontic teams set out to create a new prestigious office space they turned to Johnson Air. With Nalchajian Orthodontics emphasis on combining high tech solutions with a staff that puts patients (and parents!) at ease, we understood that our air conditioning and heating system could help reflect that mission.

From the start Johnson Air worked with the office team and building contractor to design a high-tech system that would be engineered to exceed comfort expectations and operate efficiently. By combining engineered equipment and duct sizing, with a high efficiency multi-zone system the entire office is heated and cooled with minimal equipment. This not only means energy savings, but increased comfort as the staff is able to set the temperature in offices, exam rooms, and waiting area that respond to changing load demands, and the desires of the staff.